prim80752:Errors for PROCEDURE ADMUSER.PV_OPEN_PROJECT:
| Solution ID: prim80752 |
| Errors for PROCEDURE ADMUSER.PV_OPEN_PROJECT: |
| Status: Reviewed |
| Version(s): 6.2.1 |
| Fact: | Oracle 9i is not a tested configuration for P6.2.1 and the (:= set) statement is not recognized by Oracle 9i. |
| Problem: | Errors for PROCEDURE ADMUSER.PV_OPEN_PROJECT: |
| Problem: | When upgrading from P6 to P6.2.1 manually on an Oracle 9i platform the orpm_src.sql script fails to compile |
| Problem: | Upgrade fails on projidlist := set(projidlist); or projid_array := set(projid_array); |
| Problem: | Warning: Procedure created with compilation errors Errors for PROCEDURE ADMUSER.PV_OPEN_PROJECT: 112/17 PLS-00103: Encountered the symbol “SET” when expecting one of the following: ( – + case mod new not null <an identifier> <a double-quoted delimited-identifier> <a bind variable> avg count current exists max min prior sql stddev sum variance execute forall merge time timestamp interval date <a string literal with character set specification> <a number> <a single-quoted SQL string> pipe The symbol “SET” was ignored. |
| Fix: | Upgrade the Project Management schema using a tested Oracle Version. For a list of tested configurations of the P6.2.1 Suite, refer to the following solution: Solution ID: prim77535 Tested Configurations for 6.2.1 |