prim83349:All weather period start and finish dates default to 30/Dec/1899.
02 years ago
| Solution ID: prim83349 |
| All weather period start and finish dates default to 30/Dec/1899. |
| Status: Reviewed |
| Version(s): 8.6 |
prim74540:What products are compatible with P5/P6?
02 years ago
| Solution ID: prim74540 |
| What products are compatible with P5/P6? |
| Status: Reviewed |
| Version(s): 10.1, 11.1, 12.0, 12.1, 5.0, 6.0, 6.0.1, 6.0.3, 6.0.4, 6.1, 6.2, 7.5, 8.2, 8.5 |
prim74336:How to add the Cost Loading Module to Pertmaster 8.5
02 years ago
| Solution ID: prim74336 |
| How to add the Cost Loading Module to Pertmaster 8.5 |
| Status: Reviewed |
| Version(s): 8.0, 8.1, 8.2, 8.5 |
prim74319:Problem with option to “Resource level during each iteraton” in Pertmaster 8.5.
02 years ago
| Solution ID: prim74319 |
| Problem with option to "Resource level during each iteraton" in Pertmaster 8.5. |
| Status: Reviewed |
| Version(s): 8.5 |
prim74013:Minimum, Most Likely, and Maximum Durations are automatically rounded to the nearest day.
02 years ago
| Solution ID: prim74013 |
| Minimum, Most Likely, and Maximum Durations are automatically rounded to the nearest day. |
| Status: Reviewed |
| Version(s): 8.5 |
prim73918:Activities are not scheduled correctly when importing an MSP or Primavera project into Pertmaster 8.5.
02 years ago
| Solution ID: prim73918 |
| Activities are not scheduled correctly when importing an MSP or Primavera project into Pertmaster 8.5. |
| Status: Reviewed |
| Version(s): 8.5 |