Primavera Online Interaction
Primavera Online Interaction (POINT)
| Solution ID: prim80709 |
| SQL Server 2005 Express uninstall fails with Windows Installer error. |
| Status: Reviewed |
| Version(s): 6.2.1 |
| Solution ID: prim80703 |
| Resource units per period calculated incorrectly. |
| Status: Reviewed |
| Version(s): 8.1, 8.2, 8.5, 8.6 |
| Solution ID: prim80692 |
| The Resource Analysis Chart on the dashboard displays ‘No Data Available’ when summarized by Financial Period. |
| Status: Reviewed |
| Version(s): 6.2, 6.2.1 |
| Solution ID: prim80691 |
| The GroupServer has gotten into a state that caused Timesheet logons to be denied. |
| Status: Reviewed |
| Version(s): 6.2, 6.2.1 |
| Solution ID: prim80667 |
| P6 LDAP : Unable to login using LDAP authentication, Invalid login name or password. |
| Status: Reviewed |
| Version(s): 6.0, 6.1, 6.2, 6.2.1 |
| Solution ID: prim80686 |
| Is there an option / ability to select the Project Baseline and User Secondary and Tertiary Baseline in the Header/ Footer of the Page Setup? |
| Status: Reviewed |
| Version(s): 5.0, 6.0, 6.1, 6.2, 6.2.1 |